
Westwood, MA has seen plenty of renovations and new homes in recent years. A new deck often goes on as the last piece of a bigger project. Hendo Construction brings deck installation and repair in Westwood into that schedule, working alongside the builder.
Westwood, MA decks on new construction and major renovations are a regular part of our work. Since 2000, more than half of Westwood's new single-family homes went up where an older house was torn down. Other owners keep their Capes and colonials and add on instead. Either way, the deck usually comes near the end. Getting the timing and the connection to the house right takes coordination.
When an addition goes on the back of a house, the old deck often has to come off. We remove it carefully and save the parts that can be reused, if the owner wants. The new deck is designed to suit the addition, not just the old house. Door locations, floor heights and window placement all shape the layout. We review the addition plans before drawing the deck. The two are designed to work together. Changes to the addition plans are passed on to us quickly.
The ledger connection matters even more on new framing. We coordinate with the builder so the ledger area is flashed before the siding goes on. That way the flashing laps correctly under the wall barrier. The deck attaches to solid framing, not just the new siding. Water sheds outward from the very first rain. The house and deck are protected from day one. Owners see photos of the flashing before it is covered.
Timing the deck around other trades keeps the project moving. Footings can go in while interior work continues. Framing can follow once the exterior wall is ready. Decking and finish work come last, after heavy equipment has left the yard. We share our schedule with the builder and adjust as the project moves. Owners get updates on when the deck crew will be on site. Nobody is left guessing about the next step.

New homes built on Westwood teardown lots often leave the deck to the owner. We design decks that suit the new house and the size of the lot. Composite and wood decking are both options, chosen to match the exterior. We set the decking a step lower than the threshold, keeping rain out of the addition. Footings are placed in undisturbed soil, away from backfill near the foundation. The new deck is as solid as the new house.
Owners of new homes can also plan the deck in stages. A smaller first phase can go in now, with room to expand later. We design the framing so the future addition ties in cleanly. Footings for the later section can even be placed now, while the yard is open. Decking colors are recorded so the new boards can match. The deck can grow without looking pieced together.
We review the house or addition plans and meet the owner, and the builder if there is one. Door locations, floor heights and the project schedule are noted. The free estimate covers removal of any old deck, footings, framing, decking and any phased work. Timing is set to fit the larger project. Our office files the deck permit with Westwood when it is separate from the main permit. Everyone knows when the deck crew will arrive.
Want the full picture of our work? See our deck installation and repair in Massachusetts page.
Westwood addition plans are reviewed before the deck is drawn. Doors, floor heights and windows then all shape the final deck layout.
On new Westwood framing, the ledger area is flashed before siding goes on. The flashing then laps correctly under the wall barrier.
Westwood deck footings, framing and decking are scheduled around other trades. Finish work comes only after the heavy equipment leaves the yard.
Footings on new Westwood homes go into undisturbed soil. They stay well clear of the loose backfill near the new foundation walls.
A deck planned with the rest of a Westwood project fits better and lasts longer. These are the results owners notice at the end.
Real photos from finished jobs on homes and business properties. Each one shows the work the way it looked when the crew packed up and left the site.
8 of 50
Reviews from Massachusetts homeowners and property owners who worked with Hendo Construction Inc, straight from Google.
Straight answers for Westwood owners about decks work. Still have a question? Call us.
Questions about Westwood? We answer them.
Yes. We review the addition plans and coordinate with your builder on timing and the ledger connection.
Usually near the end. Footings can go in earlier, with decking after heavy equipment leaves.
Yes. We design the framing so a future section ties in cleanly.
Old deck removal, footings, framing, decking and any phased work are listed separately.
Yes. We carry insurance on Westwood deck projects and hold a Massachusetts license with HIC registration.
The same crew works in the towns around Westwood. Pick yours to see the local page.
Tell us about your Westwood addition or new home and when the deck should go in. We'll review the plans and send an estimate.
Siding in Westwood
Westwood siding on new additions goes on after the deck ledger area is fully flashed.
Learn More
Roofing in Westwood
Westwood roofs over new dormers and additions are tied into the old roof very cleanly.
Learn More
Gutters in Westwood
Westwood gutters on renovated homes are hung once the roof and deck work are done.
Learn More
Windows in Westwood
Westwood addition windows facing the deck are chosen to match the original house in style.
Learn More
Doors in Westwood
Westwood back doors in new additions are set so the deck sits one step below.
Learn More
Painting in Westwood
Westwood decks and new trim are stained or painted once the whole project wraps up.
Learn More