
Leominster, MA has blocks of two-and three-family houses with porches stacked one above another. Painting them takes height, planning and respect for the tenants inside. Hendo Construction paints Leominster multifamily exteriors from top to bottom.
Leominster, MA homes and rental properties get exterior, interior and trim painting from Hendo Construction. Leominster's manufacturing past earned it the nickname Pioneer Plastics City. Workers' housing filled the neighborhoods around downtown. Many of those buildings are two-and three-family houses with a porch on every floor. Their exteriors are tall, detailed and lived in by several households at once.
A three-family house can stand three stories plus an attic. Ladders alone often can't reach the top safely. We set up staging or pump jacks along the tallest walls. That gives the crew a stable platform for scraping, priming and painting. Staging is placed so tenant doors, stairs and driveways stay open. It's tied off and checked daily. Each wall is finished from the top down so drips never land on completed work. Rain days pause the work, and staging stays secured until the crew returns.
Prep on these buildings takes time. Decades of paint layers can be thick and uneven. Loose paint comes off, rough edges get sanded and bare wood is spot-primed. Joints at corner boards, window casings and porch connections are recaulked. Soft wood on sills and porch trim is flagged for repair before painting. Then the body and trim get two finish coats. The building looks crisp from the sidewalk again. Window sashes and storm frames are scraped and painted with care. Basement windows and foundation trim are included, so nothing looks missed at ground level.
Color plans for multifamily buildings are often simple and durable. Owners may want a body color that hides dirt and a trim color that stays bright. Porch details can take a third color to give the building character. We show samples on the building and view them from the opposite sidewalk. The plan is written down so future touch-ups match. Owners of several buildings can use one scheme for all of them. Downspouts and gutters can be painted to blend with the body color. Records of every color stay on file.

Each floor's porch has its own ceiling, floor, railings, posts and balusters. That adds up to a lot of detail on one building. Porch ceilings are scraped and repainted in a light color. Floors get a porch and floor paint made for foot traffic and weather. Railings and balusters are sanded and brushed by hand, so every side is coated. Posts are checked at the base for rot. Each porch is done before the crew moves to the next.
Tenants use their porches every day, so we work with them. Notices go out before work starts, and furniture is moved only with permission. Wet floors are marked until they've cured. Porch doors are kept usable whenever possible. Porch steps get a slip-resistant finish where people climb them every day. Lattice under the lowest porch is cleaned and painted or flagged for replacement. When a level is done, its tenant gets the porch back first. The crew then moves to the next floor.
Every wall and porch is reviewed on a walk with the owner. Height, access, peeling areas, rot and porch details are logged in photos. Staging, prep, priming and finish coats are then priced per wall and per porch level. Tenant notices are prepared in advance. Staging season here lasts from late spring into early fall. Owners with several buildings can schedule them back to back. Colors are approved before staging goes up. Owners get photos as each wall and each porch level is completed.
Want the full picture of our work? See our painting in Massachusetts page.
Tall Leominster walls are painted from staging or pump jacks. Tenant doors, stairs and driveways stay open while the crew works above.
Each Leominster wall is finished from the top down. Drips never land on completed work, and the building looks even when done.
Leominster porch ceilings, floors, railings and balusters are painted level by level. Each porch is finished before the crew moves any higher.
Leominster tenants get notices before work starts. Porch furniture is moved only with permission, and wet floors stay clearly marked until cured.
A freshly painted multifamily building helps owners keep good tenants. Leominster owners notice these results.
Real photos from finished jobs on homes and business properties. Each one shows the work the way it looked when the crew packed up and left the site.
8 of 50
Reviews from Massachusetts homeowners and property owners who worked with Hendo Construction Inc, straight from Google.
Straight answers for Leominster owners about painting work. Still have a question? Call us.
Questions about Leominster? We answer them.
Yes. Staging is placed to keep doors and stairs open, and tenants get notices before work starts.
With staging or pump jacks, tied off and checked daily for safety.
Yes. Ceilings, floors, railings, balusters and posts are painted level by level.
Building height and how many porch levels it has matter most, since staging is a big part of the work.
Yes. Staging and porch work in Leominster is insured, under the state license and HIC registration Hendo Construction holds.
The same crew works in the towns around Leominster. Pick yours to see the local page.
Tell us about your Leominster building, its height and its porches. A free estimate follows our walk-around.
Siding in Leominster
Leominster two-and three-family siding is replaced from staging planned around the porches and tenants.
Learn More
Roofing in Leominster
Leominster multifamily roofs are replaced in a single push so tenants are never left exposed.
Learn More
Gutters in Leominster
Leominster gutters on tall buildings are sized so overflow never splashes onto the stacked porches.
Learn More
Windows in Leominster
Leominster apartment windows are replaced floor by floor, with tenants notified ahead of each visit.
Learn More
Doors in Leominster
Leominster porch doors on each floor are replaced with sturdy units that tenants open daily.
Learn More
Decks in Leominster
Leominster decks damaged by heavy rain get their footings reset and the soaked framing repaired.
Learn More